Tuesday, March 20, 2012

Web Interface Design (Front Page)

Extra day
Final day
Day3

Day2

Day1


This front page design was very complicated and took a lot of hard work and revising, it took 5 days to complete this project including the extra days that we were given to complete this project. For this project we had to create a home page for our web site and the tools that were used to complete the project was the color tool and the shape tool and the text tool.







Thursday, March 8, 2012

Kony 2012 promo package



Final Day


Day3

Day2

Day1
Sketch


The Kony 2012 promo package took a lot of research and a lot of time and work, the 4day project had a lot of meaning to it and was something that I support and enjoyed doing. For this project we had to creat a hand flyer, poster and sticker to support Kony2012, the tools used to creat this project was the gradient tool, the shape tool, and the symbol tool. My Kony 2012 promo package turned out to be a B project, my project was very different from the other Kony 2012 flyers and posters and that is what I was trying to go for.

Monday, March 5, 2012

CHARACTER PROFILE SHEET

Final day


Day1




This character profile sheet that we had to design is 2days required me to stay focus and use my time wisely, this was done in Adobe Illustrator and the tools used to create this project was the text tool and the gradient tool and the elements of art used to design this project was color. I think that my project turned out to be a A- project and really stood out, the color I choose for my profile sheet was very different and was not a simple average Character profile sheet.